top of page
RTC Logo

SPARKS BLVD

PROJECT

PROJECT DOCUMENTS

Public Meeting Documents

View materials from public meetings for the Sparks Blvd Project Phase 2, including presentations, agendas, and other related documents. Meetings are held to share project updates, gather community feedback, and outline next steps.

July 15th Meeting Documents

Corridor Study

The Sparks Boulevard Multi-Modal Corridor Study was developed in 2015.

Project Fact Sheet

Click the link below to download the Sparks Boulevard Project Fact Sheet.

Cross Section 2

Click link to view the cross section of Sparks Boulevard from Prater Way to Baring Boulevard.

Environmental Assessment (EA)

The Environmental Assessment (EA) was approved in 2023.

Cross Section 1

Click link to view the cross section of Sparks Boulevard from Lincoln Way to Prater Way.

SERVICES

Environmental Assessment (EA)

The Environmental Assessment (EA) was approved in 2023. Click the button below to download the full Environmental Assessment (EA).

Finding of No Significant Impact (FONSI)

The Finding of No Significant Impact (FONSI) was approved on March 1, 2024. Click the button below to download the full Finding of No Significant Impact (FONSI). 

PREFERRED ALTERNATIVE

The RTC, in cooperation with the Nevada Department of Transportation (NDOT) and City of Sparks, have identified a preferred alternative for the corridor. The (2015) Corridor Study helped develop recommended improvements based on purpose, needs, and priorities. The recommended improvements were then refined into the preferred alternative based on input from the public, understanding planned improvements adjacent to the corridor, land-use development, and traffic volume forecasts based on growth in our community. The recommended improvements were further evaluated on their benefit or impact to several criteria including safety, bicycle/pedestrian access, right-of-way, wetlands, drainage, recreational/historical features, traffic operations and cost. The findings from this evaluation are incorporated into the development of the EA for Phase 2 of the project.

Phase1 Greg Rendering clip

Phase 1

Greg Street to I-80 WB Ramps

Phase1 I-80 Rendering clip

Phase 1

I-80 Overpass

​

Phase1 Greg Rendering clip

Phase 2

I-80 WB Ramps to Lincoln Way

Phase2 Lincoln Way Rendering clip

Phase 2

Lincoln Way to Prater Way

​

Phase2 Marina Rendering clip

Phase 2

Prater Way 

Intersection

Phase2 Prater Rendering clip

Phase 2

Prater Way to O'Callaghan Intersection

Phase2 Springland Rendering clip

Phase 2

Springland/O'Callgahan Intersection

Phase2  O'Callaghan Rendering clip

Phase 2

O'Callaghan Intersection to Baring Blvd​

Phase2 Baring Rendering clip

Phase 2

Baring Blvd Intersection

​

Learn more about how Sparks Boulevard improvements are being constructed in two phases and view an updated schedule.

© 2025 RTC Washoe

Building a Better Community through Quality Transportation.

bottom of page